Project details
As the work progressed, reinforcement details were checked before casting, with formwork fixed around the foundation and column bases to support accurate concrete placement. The team continued inspecting the column bases, foundation trenches, materials, and masonry edges throughout the process. Later stages show the foundation pads, raised base, slab progress, and plastered structural wall/base details taking shape. Overall, the project demonstrates a complete early-stage construction process, from site layout and ground assessment through to reinforced foundation works and prepared structural base development.